90-day total
235
Chicago, IL · HVAC
235 HVAC permits were issued between Aug 22, 2026 and Nov 19, 2026 — about 2.58 per calendar day, on 67 days that had at least one. Up 4% in the last 30 days (84 permits) versus the 30 days before that (81).
7-day free trial, then monthly. 30-day lead guarantee. Checkout links are Stripe test-mode placeholders until billing is connected.
90-day total
235
Last 30 days
84
Up 4% in the last 30 days (84 permits) versus the 30 days before that (81).
Peak day
11
Nov 10, 2026
Counts are issued permits in seven-day buckets from the start of the 90-day window. Partial final weeks are expected.
Street address, work description, issue date, and published valuation only. No homeowner names, phones, or emails.
| Date | Address | Description | Valuation |
|---|---|---|---|
| Nov 19, 2026 | 6553 N SHERIDAN RD | REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 2 EXHAUST FAN(REPLACING EXISTING WITH NEW EFFICIENT) . ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), 1 INTERIOR COMMON AREAS, INTERIOR. | $18,500 |
| Nov 18, 2026 | 8029 S ELIZABETH ST | NEW HEAT PUMP OR REFRIGERATION EQUIP., ELECTRICAL WORK UNDER THIS PERMIT = YES . LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK, SECOND FLOOR BEDROOMS AND BACKYARD. | $25,000 |
| Nov 18, 2026 | 12034 S EMERALD AVE | REPAIR/REPLACEMENT AFFECTING 2 SYSTEMS : 1 OTHER COOLING EQUIPMENT(MITSUBISHI, SUZ-AK24NLHZ, BACKYARD) 1 OTHER HEATING EQUIPMENT(MITSUBISHI, SVZ-AP24NL, FIRST FLOOR UTILITY CLOSET) . ELECTRICAL WORK UNDER THIS PERMIT = YES . LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK, FIRST FLOOR UTILITY CLOSET AND BACKYARD. | $25,000 |
| Nov 18, 2026 | 6437 S KENWOOD AVE | SELF-CERT 2019 CBRC: NON-STRUCTURAL INTERIOR REPAIR OF (1) UNIT (APT 6439-34W) AT AN EXISTING 3-STORY, 25-UNIT, NON-SPRINKLERED MASONRY BUILDING. EXISTING LAYOUT TO REMAIN. NO PLUMBING OR HVAC WORK (OCCUPANCY GROUP R-2, TYPE III-A CONSTRUCTION, R-2 OCCUPANCY). | $50,000 |
| Nov 17, 2026 | 9331 S HALSTED ST | REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 1 DUCT FURNACE(GODODMAN, GR9S95960803BM, BASEMENT) . ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), BASEMENT. | $4,414 |
| Nov 17, 2026 | 4751 S WOODLAWN AVE | NEW HEAT PUMP OR REFRIGERATION EQUIP., ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), BASEMENT TO REPLACE AIR HANDLER. | $25,000 |
| Nov 17, 2026 | 5347 N LINCOLN AVE | REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 3 ROOFTOP PACKAGED UNIT(CARRIER, 48FEEA05A2M5-3W1F0, ROOFTOP RTU 1,4,5) 2 ROOFTOP PACKAGED UNIT(CARRIER, 48FEEM09A2M5-3W1F0, ROOFTOP RTU 2, 3) . ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK, ON THE ROOFTOP. | $22,870 |
| Nov 17, 2026 | 10829 S MAPLEWOOD AVE | SPR 2019 CBC. INTERIOR ALTERATIONS TO EXISTING 2 STORY MASONRY SFR WITH BASEMENT (IIIA CONSTRUCTION, R-5 OCCUPANCY). REMODELING INCLUDE ELECTRICAL, PLUMBING AND HVAC WORK. REPLACE EXISTING REAR WOOD DECK WITH NEW STAIRS & LANDING. NEW TWO CAR FRAME DETACHED GARAGE. ALL WORK AS PER PLANS. | $125,000 |
| Nov 17, 2026 | 7919 S ESSEX AVE | SPR 2019 CBC. CORRECTION OF BUILDING CODE VIOLATIONS, REHABILITATION OF EXISTING THREE STORY SIX DWELLING UNITS MASONRY APARTMENT BUILDING WITH BASEMENT (OCCUPANCY R2, CONSTRUCTION TYPE IIIA). REHABILITATION INCLUDES HVAC, ELECTRICAL AND PLUMBING WORK. REPLACE EXISTING REAR ENCLOSED PORCH WITH NEW REAR FRAME THREE STORY OPEN PORCH. ALL WORK AS PER PLANS. | $400,000 |
| Nov 16, 2026 | 2710 N LAKEVIEW AVE | DUCTWORK EXTENSION/RECONFIGURATION, REPAIR/REPLACEMENT AFFECTING 2 SYSTEMS : 3 ROOFTOP PACKAGED UNIT(CARRIER, 48NL, ROOF) 2 FAN COIL UNIT(UNICO, 2430, CLOSETS) . ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK, 2710 N LAKEVIEW. | $100,000 |
| Nov 16, 2026 | 5201 N RESERVE AVE | NEW HEAT PUMP OR REFRIGERATION EQUIP., ELECTRICAL WORK UNDER THIS PERMIT = YES . LOCATIONS: 6 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK, OUTSIDE OF BUILDING. | $55,636 |
| Nov 16, 2026 | 174 N MICHIGAN AVE | INTERIOR REMODELING OF THE EXISTING 2ND FLOOR 5829 SPACE TO A NEW RESTAURANT INCLUDING ARCHITECTURAL, ELECTRICAL, HVAC AND PLUMBING WORK. | $680,000 |
| Nov 13, 2026 | 3249 N CENTRAL AVE | REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 1 ROOFTOP PACKAGED UNIT(CARRIER, 48K3GF20-OE6AOF3SO, ROOF) 1 ROOFTOP PACKAGED UNIT(CARRIER, 50K3AF40-3E6AOF3SO, ROOF) . ELECTRICAL WORK UNDER THIS PERMIT = YES . LOCATIONS: 0 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK, EXISTING ROOF. | $75,000 |
| Nov 13, 2026 | 2823 N FRANCISCO AVE | SPR 2019 CBRC: LEVEL 2 ALTERATION: INTERIOR & EXTERIOR ALTERATION OF AN EXISTING DETACHED SINGLE-FAMILY RESIDENCE (ONE DWELLING UNIT), KITCHEN RECONFIGURATION WITH NEW PLUMBING & ELECTRICAL FIXTURES IN NEW LOCATIONS. MECHANICAL WORK INCLUDES RELOCATION OF EXISTING CONDENSING UNIT, NEW KITCHEN EXHAUST DUCTWORK & EXTERIOR TERMINATION, REPLACE EXISTING REAR PORCH WITH NEW ONE-STORY OPEN PORCH, OCCUPIABLE ROOF DECK ABOVE WITH NEW CONTINUOUS CONCRETE FOUNDATION WALL AND NEW CONCRETE STAIRS TO BASEMENT ENTRY. NEW SECOND-FLOOR EXTERIOR DOOR SERVING ROOF DECK; FULL SIDING REPLACEMENT OCCUPANCY GROUP R-5, TYPE VB CONSTRUCTION PER PLANS | $212,340 |
| Nov 13, 2026 | 635 N RIDGEWAY AVE | SPR CBC 2019EXISTING 2 STORY W/ BASEMENT SINGLE FAMILY HOUSE INTERIOR REMODEL.REAR ADDITION @ BASEMENT, 1ST FL & 2ND FL.NEW ROOF.NEW HVAC, ELECTRICAL & PLUMBING. | $130,000 |
| Nov 12, 2026 | 5335 N ST LOUIS AVE | HYDRONIC PIPING EXTENSION/RECONFIGURATION, REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 1 BOILER - HOT WATER(BURNHAM P-206, LOCATED IN BASEMENT) . ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), BASEMENT. | $14,000 |
| Nov 12, 2026 | 2960 N LAKE SHORE DR | REPAIR/REPLACEMENT AFFECTING 2 SYSTEMS : 1 COOLING TOWER(BALTIMORE AIRCOIL VTI CLOSED CIRCUIT COOLING TOWER) 1 CHILLER(DAIKIN M/N# WMC060DDSEA, PENTHOUSE) 4 BOILER - STEAM(CLEAVER BROOKS-750-250 CLEAR FIRE FIRETUBE CONDENSING BOILERS, PENTHOUSE) . ELECTRICAL WORK UNDER THIS PERMIT = YES . LOCATIONS: 0 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK, ROOFTOP. | $4,030,448 |
| Nov 12, 2026 | 3330 S DR MARTIN LUTHER KING JR DR | REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 1 TERMINAL UNIT(TRANE RAUCC40FPT0000DFO0000 ROOFTOP) . ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 0 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK, ROOF TOP. | $160,000 |
| Nov 11, 2026 | 10000 W OHARE AIRPORT | REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 1 BOILER - HOT WATER(LOCKINVAR BOILER IN MEZZANINE BOILER ROOM) . ELECTRICAL WORK UNDER THIS PERMIT = YES . LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK, MEZZANINE. | $150,000 |
| Nov 10, 2026 | 9730 S PRINCETON AVE | REPAIR/REPLACEMENT AFFECTING 2 SYSTEMS : 1 OTHER COOLING EQUIPMENT(BOSCH BOVB-60MTB-M19E, BACKYARD) 1 OTHER HEATING EQUIPMENT(BOSCH BGH97M100C5C , IN BASEMENT) . ELECTRICAL WORK UNDER THIS PERMIT = NO . LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), EXTERIOR WORK, BASEMENT AND BACKYARD. | $25,000 |
Business names as published by the city. Personal names are withheld. Valuation is a sum of the city’s figures and is often incomplete.
| Rank | Contractor | Permits | Published valuation |
|---|---|---|---|
| 1 | BACA PLUMBING CORP / PRECISION CONSTRUCTION & FLOORING INC / L & M ELECTRICAL CO. | 6 | $375,000 |
| 2 | ZERO HOME CORPORATION / JAYNCO ELECTRIC | 6 | $150,000 |
| 3 | HAYES COMMERCIAL LLC | 4 | $18,396,354 |
| 4 | ANCHOR MECHANICAL, INC | 4 | $982,000 |
| 5 | WESTSIDE MECHANCIAL DESIGN/BUILD LLC | 3 | $201,890 |