Mesa, AZ · Remodel

Remodel permits in Mesa this quarter

242 remodel permits were issued between Aug 22, 2026 and Nov 19, 2026 — about 2.66 per calendar day, on 55 days that had at least one. Up 8% in the last 30 days (91 permits) versus the 30 days before that (84).

7-day free trial, then monthly. 30-day lead guarantee. Checkout links are Stripe test-mode placeholders until billing is connected.

90-day total

242

Last 30 days

91

Up 8% in the last 30 days (91 permits) versus the 30 days before that (84).

Peak day

9

Aug 24, 2026

Sample recent permits

Street address, work description, issue date, and published valuation only. No homeowner names, phones, or emails.

DateAddressDescriptionValuation
Nov 19, 20264141 N STONE PEAK CIRDemolition of approximately 14' of load bearing wall, and replacing it with a structural glue lam beam, supported by structural wood posts. No electrical, mechanical or plumbing. VB construction. Minimum required building inspections: Frame and final.$8,000
Nov 19, 2026205 S MESA DR 101Remodel of existing residence into a two-bedroom, den, 3 baths, new 385 S.F. patio addition to existing residence, a detached ADU/garage at rear of property. New 370 S.F. livable ADU attached to new 2015 S.F. garage. Special Inspections required for Drill & Epoxy. Minimum required building inspections: Footing, stem, strap/shear, frame, insulation, drywall shear and final. If needed, underground electrical and plumbing.$353,891
Nov 19, 20261955 W MAIN ST 102Group A-2. Type V-B construction. 4,256 SF. Occupant load 118. Nonseparated occupancy building. Existing restaurant suite. New demising wall, architectural, and MEP. Interior Demo REF: PMT26-14990. Deferred fire sprinklers. Approved as noted. Results in CofO.$1,082,737
Nov 18, 20261233 E JENSEN STRELATED TO COB26-00372 Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. A completed Contractor Verification Form must also be submitted prior to being issued a permit. This structure is to be restored like for like construction in compliance with 2023 NEC, 2024 IRC/IBC requirements. Any alterations or changes will require submitting plans before any restoration can begin. During the damage inspection the following was observed: Structural members have been damaged by and will need an engineers observation letter. Electrical sustained minor damage. The panel may need to be replaced if determined that the electrician can?t bring it to current codes. Replace damaged wire per 2023 NEC and/or 2024 IRC/IBC Mechanical equipment/ducts sustained minor damage. Will need to clean/repair ductwork Plumbing was damaged and will need repairs$37,649
Nov 18, 20261400 S DOBSON RDReplace existing fire sprinkler system discharge water mains and feeder piping. Permit Scope - The fire sprinkler feed mains and cross mains are required to be replaced at this facility due to wear and age: at floors 2C and 4C, 2-1/2 and 4 inches. The scope of the replacement will not include branch lines, arm-overs, or sprinklers. The scope of this replacement is governed by NFPA 25. The piping will be replaced with the same nominal diameter pipe and be of the same schedule, which is schedule 10 pipe. Per AZ Registrant.$200,000
Nov 18, 202610624 E FORGE AVERepair existing foundation including installation of reinforcing bars and helical piles for foundation stabilization. Type V-B construction. Special inspections required for helical piles and reinforcing installation. Minimum required building inspections: Footing, stem, and final.$1,461
Nov 18, 20264122 E MCLELLAN RD 16Convert 528 sq ft garage into 2 new livable sleeping areas and a new adjoining bathroom with plumbing, electrical and mechanical onto existing SFR. VB construction. Engineering for modification to existing post-tension slab. Minimum required building inspections: Slab repair per engineering, frame, mechanical rough in, electric rough in, plumbing rough in, insulation, drywall shear, electrical final, mechanical final, plumbing final and final. If needed, underground electrical and plumbing. Custom Home Under PMT25-15399.$100,000
Nov 18, 20268945 E PETERSON AVEInstallation of approximately 280 linear feet of racking, within an existing warehouse. Scope includes approximately 3,000 SF of high-piled combustible storage for Class IV commodities, with a maximum storage height of 25 feet. Special inspection for post-installed anchoring. Results in CoC.$65,000
Nov 18, 20261907 S HOBSON 101Interior TI within an existing type III-B construction, 89,456 SF tenant space. New occupancy includes. B, S-1 and F-1 occupancies with accessory A-3. Scope includes (8) new offices, a break room, warehouse air conditioning replacing evaporative cooling, structural supports, insulation, wall openings, and associated MEP's. (1) new 200A electric meter. Special inspections for steel. High-piled combustible storage by separate permit. Deferred fire sprinklers. Results in CoO.$11,878,307
Nov 18, 20263515 S ELLSWORTH RD 109Group B occupancy. Type V-B construction. 2,254 SF. Occupancy load 46. Build out of suite in new building. REF: PMT23-21513 (Shell Building). New architectural and electrical. New electrical meter 200A 3 phase. Results in CofO.$525,602
Nov 17, 20261644 E GLADE AVERepair existing foundation including installation of reinforcing bars and helical piles for foundation stabilization. Type V-B construction. Special inspections required for helical piles and reinforcing installation. Minimum required building inspections: Footing, stem, and final.$18,642
Nov 17, 20261918 E HUBER STRemodel 1,926 SF of existing residence, including removal of dropped soffits, relocation of existing HVAC ductwork to attic, master bathroom remodel and removal of interior non-bearing walls. No changes to HVAC equipment or electrical scope. No utility upgrades. Type V-B construction. Minimum required building inspections: Frame, mechanical rough in, plumbing rough in, insulation, drywall, mechanical final, plumbing final and final.$45,000
Nov 17, 202611414 E SOLINA AVERemodel of 176 SF to correct previously permitted bedroom conversion under PMT24-19645 to reflect existing conditions. Previously proposed bedroom window was not installed. Relabel room as storage and revise plans to show existing wall without window installation. No new structural, electrical, mechanical or plumbing work proposed.$1,000
Nov 17, 20269657 E IRWIN AVEStem Wall Repair. Special inspections required for: Stem wall repair.$582
Nov 17, 2026204 E HAMPTON AVEAddition of 5th bedroom, remodel of existing bedroom and bathrooms including plumbing and electrical. No structural work or change in footprint. VB construction. No change to utilities. No deferred items. No special inspections. Minimum required inspections: Footing, stem, strap/shear, frame, Electrical rough, Plumbing rough, insulation, drywall shear, Electrical final, Plumbing final and final. If needed, underground electrical and plumbing.$10,000
Nov 17, 2026237 E BROADWAY RDThis permit for Suite 103. Tenant improvement to existing building to create (3) new suites. Add overhead door at west facade. Remodel existing restrooms for ADA compliance. Remove existing electrical service and replace with new 400A multi-meter SES. No fire sprinkler system. F: STIPULATION. Provide a minimum 2A-10B:C type fire extinguisher in accordance with IFC 906. COB22-00120. Related to PMT22-15927. Expedite$300,692
Nov 16, 20262740 S ALMA SCHOOL RD 4Tenant improvement at existing 1,350 SF, type VB construction, B occupancy vacant suite for Nail and Spa. Modifications include new walls, ceiling, new RTUs, exhaust sys for nail stations and spa chairs, new supply ducts, new lighting, power, plumbing for foot spa chairs, utility sinks, washer dryer, new WH. (1) existing ADA restroom. Deferred fire sprinklers. Approved with comments. Results in CofO.$349,844
Nov 16, 20268019 E SEBRING AVE 101Install racking and associated high pilled storage in suite of new building. Special inspections required: post-installed anchors. Results in CofC.$150,000
Nov 16, 20267733 E VELOCITY WAY 109Tenant improvement of existing 250,150 SF, type VB construction, group B, A, S1 and F1 occupancy warehouse. Modifications for this Phase 3 include minor relocation of existing interior fencing area between F1 manufacturing and S1 (future space) to the install of equip at existing F1 manufacture area. Modification include new mech RTU and associated MEP. Deferred fire sprinklers, fire alarms, and access control. Deferred access control to be submitted under PMT25-21714. Hazardous materials under PMT25-10280. REF: PMT25-10280 PH1 TI, REF: PMT25-21714 PH2 TI. Results in CofC.$150,000
Nov 16, 20261840 W SOUTHERN AVE 14Group A-2 occupancy. Type III-B construction. 2,100 SF. Occupant load 67. New restaurant remodel in existing non-separated building suite. New architectural and MEP. Results in CofO.$613,058

Top remodel contractors in Mesa

Business names as published by the city. Personal names are withheld. Valuation is a sum of the city’s figures and is often incomplete.

RankContractorPermitsPublished valuation
1WILLMENG CONSTRUCTION, INC10$52,442,851
2JK ALARMS OF AZ4$20,600
3TOP CHOICE ELECTRICAL CONTRACTORS CORP3$4,386,698
4T BUILT LLC3$75,000
5ARIZONA FOUNDATION REPAIR, LLC3$11,313

Full remodel contractor ranking for Mesa